Have a non-directory at the top, so creating directory top_dir Adding /usr/src/redhat/BUILD/kernel-2.4.2/linux/COPYING to top_dir Adding /usr/src/redhat/BUILD/kernel-2.4.2/linux/CREDITS to top_dir Creating filelist for Documentation Adding /usr/src/redhat/BUILD/kernel-2.4.2/linux/MAINTAINERS to top_dir Adding /usr/src/redhat/BUILD/kernel-2.4.2/linux/Makefile to top_dir Adding /usr/src/redhat/BUILD/kernel-2.4.2/linux/README to top_dir Adding /usr/src/redhat/BUILD/kernel-2.4.2/linux/REPORTING-BUGS to top_dir Adding /usr/src/redhat/BUILD/kernel-2.4.2/linux/Rules.make to top_dir Creating filelist for arch Creating filelist for configs Creating filelist for devfsd Creating filelist for drivers Creating filelist for fs Creating filelist for include Creating filelist for init Creating filelist for ipc Creating filelist for kernel Creating filelist for lib Creating filelist for mm Creating filelist for net Creating filelist for scripts Categorizing files. Warning: in include, number of duplicates=101 Counting files. Counting SLOC. SLOC Directory SLOC-by-Language (Sorted) 1400422 drivers ansic=1396471,asm=1541,yacc=1147,perl=816,lex=302, sh=145 446030 arch ansic=301963,asm=143011,sh=492,perl=449,awk=115 240761 include ansic=240030,cpp=731 168277 fs ansic=168277 150627 net ansic=150422,awk=133,sed=72 9999 mm ansic=9999 9293 kernel ansic=9293 8098 scripts ansic=5225,sh=1540,perl=757,tcl=576 2459 ipc ansic=2459 1940 devfsd ansic=1940 1453 lib ansic=1453 858 Documentation sh=858 702 init ansic=702 0 configs (none) 0 top_dir (none) ansic: 2288234 (93.74%) asm: 144552 (5.92%) sh: 3035 (0.12%) perl: 2022 (0.08%) yacc: 1147 (0.05%) cpp: 731 (0.03%) tcl: 576 (0.02%) lex: 302 (0.01%) awk: 248 (0.01%) sed: 72 (0.00%) Total Physical Source Lines of Code (SLOC) = 2440919 Estimated Development Effort in Person-Years (Person-Months) = 721.04 (8652.51) (Basic COCOMO model, Person-Months = 2.4 * (KSLOC**1.05)) Estimated Schedule in Years (Months) = 6.53 (78.35) (Basic COCOMO model, Months = 2.5 * (person-months**0.38)) Estimated Average Number of Developers (Effort/Schedule) = 110.43 Total Estimated Cost to Develop = $ 97403073 (average salary = $56286/year, overhead = 2.4). Please credit this data as "generated using 'SLOCCount' by David A. Wheeler."